Cat Ladder Factory · Factory-Direct Since 2004
Our Factory - Cat Ladder Manufacturing
Q235B / SS304 cat ladder fabrication in one Shijiazhuang workshop — CNC cutting and welding in-house, with hot-dip galvanizing to ISO 1461, shipping 8–12 containers a month. Quote straight from the production floor.
Years Manufacturing
Countries Exported
40ft Containers / Month
Years Manufacturing
Inside the Plant Floor
Where Your Cat Ladder Is Actually Built
Trade houses quote you a factory's products. We are the factory. Every cat ladder on RoofCatLadder.com is cut, bent, welded and shipped from our own workshop in Jingxing Mining District, Shijiazhuang — so your quote comes from the production floor, not a middleman. Non-compliant access can void insurance cover and trigger regulator citations after any incident.
Integrated Workshop
Cutting, bending, welding and trial assembly under one roof — one quality system, one schedule, one accountable name.
Full Material Matrix
Q235B hot-dip galvanized steel as standard, plus SS304 / SS316 stainless (mill-certified), aluminium and GRP / FRP — all fabricated in-house.
Hot-Dip Galvanizing (ISO 1461)
85–100 µm coating thickness verified on every batch — one-piece runs to 14 m, bolted runs to 25 m.
Equipment & Capability
Cutting, Bending, Welding & HDG to ISO 1461
The machinery to hold tolerances on repeat runs — from a single 2 m roof ladder to a 25 m bolted system — with hot-dip galvanizing to ISO 1461 under our QC.
CNC Plasma / Flame Cutting
Rung and stringer blanks cut from Q235B, SS304 and SS316 plate with repeatable accuracy.
160T Hydraulic Bending
Cold-formed rungs, hoop sections and stiles with consistent angles across an entire run.
MIG / MAG Welding Stations
Cat ladders and cages welded at dedicated MIG/MAG stations with 100% visual inspection against the approved drawing.
Hot-Dip Galvanizing to ISO 1461
Full-immersion HDG to ISO 1461 at 85–100 µm — the coating is measured on every batch.
Production Line — Five Stations, One Building
A cat ladder moves through five fixed stations inside the plant. Each one has a named standard and a paper trail — so an auditor can reconstruct any order, years later, from the QC file alone.
| Station | What Happens | Standard / Evidence |
|---|---|---|
| 1. Incoming material | Steel and plate checked against the order before it enters stock | EN 10204 3.1 mill certificate on file |
| 2. Cutting & forming | CNC plasma and flame cutting; 160T press brakes form stiles, rungs and cage hoops | Dimensional check against the approved drawing |
| 3. Welding & assembly | Cat ladders and cages welded at dedicated MIG / MAG stations | 100% visual inspection against the approved drawing |
| 4. Hot-dip galvanizing (ISO 1461, QC-verified) | Full-immersion HDG; coating thickness verified per batch | ISO 1461 — typical 85–100 µm |
| 5. Trial assembly & photo | Every ladder dry-assembled, then export packing and loading photographed | QC file + loading photos, kept on file |
Monthly Export Capacity
8–12 Containers of Cat Ladders a Month
Production runs 15–25 working days from drawing approval. A single order or a container volume run down the same lines — your batch never queues behind a bigger customer indefinitely.
- 25 m single-run builds
One-piece runs to 14 m, bolted runs to 25 m; taller systems get rest platforms per OSHA 1910.28 & EN ISO 14122-4
- 280 km to Tianjin Port
EXW, FOB or CIF on your terms — ISPM 15 heat-treated packing, loose or fully assembled
- Factory-direct pricing
US catalog equivalents typically list a multiple of factory-direct rates — request an itemized quote in 24 hours.
Quality Control
5-Stage QC, Compliance Docs Included
Every cat ladder passes five gates before it is packed — and the compliance file ships with it, at no extra cost.
- Incoming Material
MTC 3.1 verified 100% for Q235B / SS304 / SS316
- Cutting & Preparation
First-piece 100% inspection to ISO 2768-mK
- Welding & Assembly
100% visual inspection against the approved drawing
- Surface Treatment
HDG ISO 1461, 85–100 µm, or powder coat; stainless acid-pickled
- Final Inspection
Trial assembly, dimensions, labeling, ISPM 15 packaging and loading photos
DoC, MTC 3.1 material certificate and engineer-signed structural calculation sheets ship with every order.
See the Full QC Process
Talk to the Factory
Talk to Our Factory Team
Ask about capacity, material grades, a 25 m single-run build or a factory audit. Our factory team replies within 24 hours — and audit visits are welcome in Shijiazhuang.
- 24h itemized quote
- Free drawing review
- DoC, MTC & structural calcs included